198.8 MW Wind operating in Clark, KS
198.8 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2020
Operating Since
Coordinates
37.3710, -99.9940
County
Clark, KS
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Enel Kansas, LLC | Enel Green Power | — |
| Owner(s) | Enel Kansas, LLC | Enel | — |
| Status | Operating | operating | — |
Cimarron Bend III is a 198.8 MW wind power plant located in Clark County, Kansas. The facility began operating in 2020 and is owned by Enel, an Italian multinational energy company. Enel Kansas, LLC is the listed operator with the Energy Information Administration (EIA). The plant utilizes one generator consisting of multiple onshore wind turbines manufactured by GE Wind, specifically model GE2.82-127. These turbines have a rotor diameter of 127 meters and a hub height of 89 meters.
The plant's latest annual generation was 588,824 MWh, resulting in a capacity factor of 33.8%. Cimarron Bend III operates within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region. It is ranked as the 26th largest power plant out of 44 in Kansas, and 365th out of 734 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
53.8K MWh
Latest Month
588.8K MWh
Annual Generation
33.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2020
$1,598/kW
Est. Construction Cost
Total estimated cost: $317.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Cimarron Bend Substation #2 · 345 kV
Substation Distance
1.799 km
Operator
Enel Green Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
SECI.GCMB.CIMARRONBEND1
Pricing Hub
SPPNORTH_HUB
Location Type
Settlement Location
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Cimarron Bend IIIForward forecasts, scenario decomposition, and risk-decision tooling for this asset.