100 MW Wind operating in Morrow, OR
100 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2020
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
45.5598, -119.6338
Reference point reported to EIA.
County
Morrow, OR
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
2 mapped line sections connect the two facilities over 31.711 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Portland General Electric Co | NextEra Energy | — |
| Owner(s) | Portland General Electric Co | NextEra Energy | — |
| Status | Operating | operating | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Wheatridge 1 is a 100 MW wind power plant located in Morrow County, Oregon. The facility began operating in 2020 and is owned by NextEra Energy, with Portland General Electric Co. serving as the operator. The plant utilizes a single generator consisting of onshore wind turbines. Specifically, it employs GE2.5-127 wind turbines manufactured by GE Wind, featuring a hub height of 89 meters and a rotor diameter of 127 meters.
In its most recent year of operation, Wheatridge 1 generated 250,315 MWh of electricity, achieving a capacity factor of 28.5%. The plant is connected to the grid within the Bonneville Power Administration balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, Wheatridge 1 ranks as the 17th largest wind farm in Oregon and 724th nationally. The plant's primary fuel source is wind (WND).
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Bonneville Power Administration (BPAT)
Grid Voltage
230.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
23.0K MWh
Latest Month
250.3K MWh
Annual Generation
28.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2020
$1,450/kW
Est. Construction Cost
Total estimated cost: $145.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
154 buyers • 8,584 active contracts
+ 149 more offtakers in the full bridge. Top 5 shown.
Browse source data on FERC EQRLast updated 2026-03-26
View all 5 articlesOregon in Oregon growth signals — PPAs, construction, new projects
Summary analysis with parallel narrative sections and visualizations.
A specific company (e.g., NextEra Energy, Duke Energy)
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
NextEra Energy
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
NextEra entity test
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.