10 MW Wind operating in Morrow, OR
10 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2020
Operating Since
Coordinates
45.3800, -119.3332
County
Morrow, OR
Nearby Plants
Forward-looking, asset-specific exposure profile combining climate hazards, generation variability, and counterparty risk into a single decision-grade signal.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Orchard Windfarm, LLC | DE Shaw Renewable Investments (DESRI) | — |
| Owner(s) | Orchard Windfarm, LLC | DE Shaw Renewable Investments (DESRI) | — |
| Status | Operating | operating | — |
GEM identifies the owner as DE Shaw Renewable Investments (DESRI)
This entity is not yet in the GEM ownership database — chain unavailable.
Orchard Windfarm 3, LLC is a 10 MW wind power plant located in Morrow County, Oregon. The facility, owned and operated by Orchard Windfarm, LLC, commenced operations in 2020. It utilizes a single onshore wind turbine generator. The primary fuel source is wind (WND). The plant ranks 30th out of 49 wind facilities in Oregon and 1152nd out of 1424 nationally.
The facility's wind turbine is a GE 2.5-127 model, manufactured by GE Wind, with a hub height of 89 meters and a rotor diameter of 127 meters. In its latest year of operation, the plant generated 27,908 MWh of electricity, achieving a capacity factor of 31.8%. The plant operates within the Bonneville Power Administration balancing authority and is part of the Western Electricity Coordinating Council (WECC) NERC region.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Bonneville Power Administration (BPAT)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
1.5K MWh
Latest Month
27.9K MWh
Annual Generation
31.8%
Capacity Factor
2020
$1,450/kW
Est. Construction Cost
Total estimated cost: $14.5M
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Orchard Windfarm 3, LLC