Search plants, projects, owners, and states
4 MW Solar operating in Ulster, NY
4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
41.8116, -74.2070
County
Ulster, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Off Airport Road - West, LLC | Off Airport Road - West | — |
| Owner(s) | Off Airport Road - West, LLC | — | — |
| Status | Operating | operating | — |
The Off Airport Road - West solar photovoltaic plant is located in Ulster County, New York. The plant, owned and operated by Off Airport Road - West, LLC, has a total capacity of 4 MW consisting of a single generator. It commenced operations in 2019, utilizing fixed-tilt solar tracking technology. The plant's primary fuel source is solar energy (SUN).
In its most recent year of operation, the Off Airport Road - West plant generated 6,698 MWh of electricity, achieving a capacity factor of 19.1%. The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, the plant is ranked 354th out of 695 power plants in New York state, and 3478th nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
13.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
252 MWh
Latest Month
6.7K MWh
Annual Generation
19.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →Data from 2020–2024
$33.8/MWh
Energy Value
$7.7/MWh
Capacity Value
Point of Interconnection
Nearest Substation
KERHONKS_69_KV_TR1_REV_LBMP_G
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone G
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Off Airport Road - West