250 MW Batteries (100 MW) + Solar Photovoltaic (150 MW) operating in Clark, NV
250 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2024
Operating Since
Coordinates
36.4259, -114.8887
County
Clark, NV
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Nevada Power Co | Invenergy | — |
| Owner(s) | Nevada Power Co | Berkshire Hathaway | — |
| Status | Operating | operating | — |
Dry Lake Solar Energy Center is a 250 MW hybrid power plant located in Clark County, Nevada. The facility, which began operating in 2024, is owned by Berkshire Hathaway and operated by Nevada Power Co. It utilizes both solar photovoltaic technology with single-axis tracking and battery energy storage. The plant consists of two generators and has a battery energy storage system (BESS) capacity of 150 MWh, with a duration of 1.5 hours and lithium-ion battery chemistry.
The plant's latest annual generation was 362,301 MWh, resulting in a capacity factor of 16.5%. Dry Lake Solar Energy Center is ranked as the 13th largest solar facility out of 20 in Nevada, and 199th out of 514 nationally. The plant operates within the Nevada Power Company balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Financial data is available for the facility, sourced from LBNL Solar.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Nevada Power Company (NEVP)
Grid Voltage
230.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
18.1K MWh
Latest Month
362.3K MWh
Annual Generation
16.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →Data from 2024
$21.2/MWh
LCOE
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
Last updated 2026-04-19
View all articlesTop solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.