Search plants, projects, owners, and states
6.1 MW Natural Gas operating in Shelby, IN
6.1 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Steam Turbine
Technology
2020
Operating Since
Coordinates
39.5600, -85.8220
County
Shelby, IN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | POET Biorefining- Shelbyville | — | — |
| Owner(s) | POET Biorefing- Shelbyville | — | — |
| Status | Operating | — | — |
POET Biorefining - Shelbyville is a 6.1 MW natural gas-fired power plant located in Shelby County, Indiana. The plant began operating in 2020 and is owned and operated by POET Biorefining- Shelbyville. It consists of a single natural gas steam turbine generator. The plant is connected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and is situated within the RFC NERC region.
In its most recent year of operation, the plant generated 34,755 MWh of electricity, achieving a capacity factor of 64.8%. POET Biorefining - Shelbyville ranks as the 33rd largest power plant in Indiana out of 41, and nationally it is ranked 1538 out of 1963 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
12.4 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
3.0K MWh
Latest Month
34.8K MWh
Annual Generation
64.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
761 lb/MWh
NOx
1 lb/MWh
SO₂
0.004 lb/MWh
CH₄
0.014 lb/MWh
N₂O
0.001 lb/MWh
Capacity Factor
63.8%
Annual Net Gen
34 GWh
CO₂eq
762 lb/MWh
Subregion
RFC West
2020
$1,116/kW
Est. Construction Cost
Total estimated cost: $6.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
INDIANA.HUB
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about POET Biorefining - ShelbyvilleForward forecasts, scenario decomposition, and risk-decision tooling for this asset.