20 MW Solar planned in Herkimer, NY
20 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
43.0654, -74.8437
County
Herkimer, NY
Nearby Plants
Forward-looking, asset-specific exposure profile combining climate hazards, generation variability, and counterparty risk into a single decision-grade signal.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Grassy Knoll Solar NY LLC | SunEast Development | — |
| Owner(s) | Grassy Knoll Solar NY LLC | Cordelio Power | — |
| Status | Planned | pre-construction | — |
GEM identifies the owner as Cordelio Power
This entity is not yet in the GEM ownership database — chain unavailable.
The SunEast Grassy Knoll Solar Project is a 20 MW solar photovoltaic power plant located in Herkimer County, New York. The plant is owned and operated by Grassy Knoll Solar NY LLC. It utilizes a fixed-tilt solar tracking system. The facility consists of a single generator and uses solar energy as its primary fuel source.
The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. Based on its total capacity, the SunEast Grassy Knoll Solar Project ranks as the 49th largest of 695 solar plants in New York state, and 1540th out of 7108 solar plants nationally. Recent news coverage indicates some activity related to grid integration.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $51.7M
Point of Interconnection
Nearest Substation
HARDSCRABBLE_WT_PWR
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone E
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about SunEast Grassy Knoll Solar Project