Search plants, projects, owners, and states
1.6 MW Natural Gas operating in Los Angeles, CA
1.6 MW
Nameplate Capacity
1
Generators
unit
Other Natural Gas
Technology
2018
Operating Since
Coordinates
33.7902, -118.2943
County
Los Angeles, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | 2016 ESA Project Company, LLC | — | — |
| Owner(s) | 2016 ESA Project Company, LLC | — | — |
| Status | Operating | — | — |
The Cantara Fuel Cell power plant, identified by plant code 63716, is located in Los Angeles County, California. The facility has a total capacity of 1.6 MW and commenced operations in 2018. It is owned and operated by 2016 ESA Project Company, LLC. The plant utilizes natural gas as its primary fuel source, employing "Other Natural Gas" technology.
The plant operates within the California Independent System Operator (CAISO) balancing authority, situated in the Western Electricity Coordinating Council (WECC) NERC region. In the most recent year for which data is available, the plant generated 12,070 MWh of electricity, achieving a capacity factor of 85.9%. Cantara Fuel Cell ranks as the 249th largest power plant in California out of 297 facilities, and 1756th nationally out of 1963 plants. The facility consists of a single generator.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
4.16 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
1.1K MWh
Latest Month
12.1K MWh
Annual Generation
85.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2018
$837/kW
Est. Construction Cost
Total estimated cost: $1.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
DISTRIBUTING STATION 123 · 35 kV
Substation Distance
1.524 km
Operator
Los Angeles Department of Water and Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
SANITR_6_UNITS-APND
Pricing Hub
TH_SP15_GEN-APND
Location Type
Aggregated Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about KSR053 Cantara Fuel CellForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo