Search plants, projects, owners, and states
242.5 MW Wind operating in Scurry, TX
242.5 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2021
Operating Since
Coordinates
32.8482, -100.8712
County
Scurry, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | EDF Renewable Asset Holdings, Inc. | EDF Renewables | — |
| Owner(s) | EDF Renewable Asset Holdings, Inc. | Masdar Clean Energy; EDF Renewables | — |
| Status | Operating | operating | — |
GEM identifies the owner as Masdar Clean Energy; EDF Renewables
This entity is not yet in the GEM ownership database — chain unavailable.
Coyote Wind LLC is a 242.5 MW wind power plant located in Scurry County, Texas. The facility, which began operating in 2021, is owned and operated by EDF Renewable Asset Holdings, Inc. It utilizes a single generator consisting of onshore wind turbines. The plant's turbines have a hub height of 107.5 meters and a rotor diameter of 145 meters, and are manufactured by Siemens Gamesa Renewable Energy, model SG-4.5-145.
In its most recent year of operation, Coyote Wind generated 646,134 MWh of electricity, achieving a capacity factor of 30.4%. The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, and the NERC region TRE. Coyote Wind ranks as the 57th largest wind farm in Texas out of 200, and 186th nationally out of 734.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
78.7K MWh
Latest Month
646.1K MWh
Annual Generation
30.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2021
$1,161/kW
Est. Construction Cost
Total estimated cost: $281.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ERCOT
LMP Node
DERMOTT_ALL
Pricing Hub
HB_WEST
Alt. Hub / Zone
LZ_WEST
Location Type
Resource Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.