11.8 MW Natural Gas Fired Combustion Turbine (6 MW) + Natural Gas Internal Combustion Engine (5 MW) operating in Passaic, NJ
11.8 MW
Nameplate Capacity
3
Generators
units
Hybrid (2)
Technology
Natural Gas Fired Combustion Turbine + Natural Gas Internal Combustion Engine
2013
Operating Since
Coordinates
40.8652, -74.1967
County
Passaic, NJ
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cartier Energy, LLC | — | — |
| Owner(s) | Cartier Energy, LLC | — | — |
| Status | Operating | — | — |
The Montclair State University Cogen plant is an 11.8 MW hybrid power plant located in Passaic County, New Jersey. The plant began operating in 2013 and is owned and operated by Cartier Energy, LLC. It utilizes both natural gas-fired combustion turbine and natural gas internal combustion engine technologies. The plant is connected to the PJM Interconnection, LLC balancing authority within the RFC NERC region.
In its latest year of reported generation, the plant produced 47,536 MWh of electricity, achieving a capacity factor of 45.8%. The Montclair State University Cogen plant ranks 27th out of 46 power plants in New Jersey and 1418th out of 1963 plants nationally. The plant consists of 3 generators.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
26.4 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Commercial
Sector
Commercial CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
3.4K MWh
Latest Month
47.5K MWh
Annual Generation
45.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1219 lb/MWh
NOx
4 lb/MWh
SO₂
0.033 lb/MWh
CH₄
0.024 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
45.5%
Annual Net Gen
47 GWh
CO₂eq
1220 lb/MWh
Subregion
RFC East
2013
$965/kW
Est. Construction Cost
Total estimated cost: $11.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
CEDARGRO69 KV CEDARGSP
Pricing Hub
WESTERN HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Montclair State University CogenForward forecasts, scenario decomposition, and risk-decision tooling for this asset.