3.5 MW Natural Gas operating in Burlington, NJ
3.5 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Fired Combustion Turbine
Technology
2012
Operating Since
Coordinates
40.1083, -74.8264
County
Burlington, NJ
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cartier Energy, LLC | — | — |
| Owner(s) | Cartier Energy, LLC | — | — |
| Status | Operating | — | — |
DCO Burlington is a 3.5 MW natural gas-fired power plant located in Burlington County, New Jersey. The plant began operating in 2012 and is operated by Cartier Energy, LLC. It consists of a single natural gas-fired combustion turbine generator. The plant is connected to the PJM Interconnection, LLC balancing authority, operating within the ReliabilityFirst Corporation (RFC) NERC region.
In the most recent year of reported data, DCO Burlington generated 16,847 MWh of electricity, achieving a capacity factor of 54.8%. In terms of size, DCO Burlington ranks as the 39th largest power plant in New Jersey out of 46 plants, and 1659th largest nationally out of 1963 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
13.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Commercial
Sector
Industrial CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1.2K MWh
Latest Month
16.8K MWh
Annual Generation
54.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1239 lb/MWh
NOx
3 lb/MWh
SO₂
0.034 lb/MWh
CH₄
0.023 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
57.0%
Annual Net Gen
17 GWh
CO₂eq
1241 lb/MWh
Subregion
RFC East
2013
$965/kW
Est. Construction Cost
Total estimated cost: $3.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Edgely Substation · 138 kV
Substation Distance
4.909 km
Operator
Amtrak
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
BUSTLETO13 KV BUSTSP
Pricing Hub
WESTERN HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about DCO BurlingtonForward forecasts, scenario decomposition, and risk-decision tooling for this asset.