Search plants, projects, owners, and states
100 MW Solar under construction in Hancock, ME
100 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
44.7116, -68.1100
County
Hancock, ME
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Three Rivers Solar Power, LLC | Swift Current Energy | — |
| Owner(s) | Three Rivers Solar Power, LLC | Swift Current Energy | — |
| Status | Under construction | pre-construction | — |
GEM identifies the owner as Swift Current Energy
This entity is not yet in the GEM ownership database — chain unavailable.
Three Rivers Solar Power, LLC is a 100 MW solar photovoltaic power plant located in Hancock County, Maine. The plant is owned and operated by Three Rivers Solar Power, LLC. It utilizes fixed-tilt solar tracking technology. The facility consists of a single generator and its primary fuel source is solar energy.
The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. According to available data, Three Rivers Solar Power, LLC is the third-largest solar plant in Maine, and ranks 629th nationally out of 639 solar plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $258.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Bull Hill Substation · 115 kV
Substation Distance
< 10 km
Operator
Versant Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
Pending
Pricing Hub
.Z.MAINE
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-04-09
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.