26 MW Geothermal operating in Churchill, NV
26 MW
Nameplate Capacity
1
Generators
unit
Geothermal
Technology
2019
Operating Since
Coordinates
39.5562, -118.8458
County
Churchill, NV
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AMOR IX, LLC | Amor 9 LLC | — |
| Owner(s) | AMOR IX, LLC | Amor 9 LLC | — |
| Status | Operating | operating | — |
GEM identifies the owner as Amor 9 LLC
This entity is not yet in the GEM ownership database — chain unavailable.
Soda Lake 3 is a 26 MW geothermal power plant located in Churchill County, Nevada. The plant began operating in 2019 and has one generator. It is owned and operated by AMOR IX, LLC. The plant's primary fuel source is geothermal energy. Soda Lake 3 is ranked as the 18th largest power plant in Nevada out of 27, and 44th nationally out of 70 geothermal plants.
In its most recent year of operation, Soda Lake 3 generated 118,139 MWh of electricity, achieving a capacity factor of 51.9%. The plant operates within the Nevada Power Company balancing authority and is part of the Western Electricity Coordinating Council (WECC) NERC region.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Nevada Power Company (NEVP)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
11.7K MWh
Latest Month
118.1K MWh
Annual Generation
51.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.