Search plants, projects, owners, and states
300 MW Solar operating in Red River, TX
300 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
33.2844, -95.1636
County
Red River, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Altus Power America Management, LLC | Invenergy | — |
| Owner(s) | Invenergy Services LLC | Invenergy LLC | — |
| Status | Operating | operating | — |
Delilah Solar Energy LLC is a 300 MW solar photovoltaic power plant located in Red River County, Texas. The plant, which began operating in 2024, utilizes single-axis tracking technology to maximize solar energy capture. It is owned and operated by Invenergy Services LLC. The plant connects to the Electric Reliability Council of Texas (ERCOT) grid, and falls within the Texas Reliability Entity (TRE) NERC region.
In its most recent year of operation, Delilah Solar generated 557,763 MWh of electricity, achieving a capacity factor of 21.2%. The plant is ranked as the 46th largest solar facility in Texas out of 192, and 74th nationally out of 639. Financial data is available for the plant from LBNL, and the plant has been mentioned in four news articles, including three about deals and one about the solar industry.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
24.5K MWh
Latest Month
557.8K MWh
Annual Generation
21.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →Data from 2024
$36.4/MWh
LCOE
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
ERCOT
LMP Node
SAMSON_ALL
Pricing Hub
HB_NORTH
Alt. Hub / Zone
LZ_NORTH
Location Type
Resource Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demoElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
NextEra vs Duke
Comparative analysis covering fleet scale, performance trends, and growth pipeline.