4.8 MW Distillate Oil operating in Bedford, VA
4.8 MW
Nameplate Capacity
6
Generators
units
Petroleum Liquids
Technology
2005
Operating Since
Coordinates
37.3321, -79.5111
County
Bedford, VA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Town of Bedford - (VA) | — | — |
| Owner(s) | Town of Bedford - (VA) | — | — |
| Status | Operating | — | — |
Orange Street G1 is a 4.8 MW petroleum-fueled power plant located in Bedford County, Virginia. The plant began operating in 2005 and consists of 6 generators utilizing petroleum liquids technology. It is owned and operated by the Town of Bedford (VA).
The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In the most recent year with available data, Orange Street G1 generated 168 MWh of electricity, resulting in a capacity factor of 0.4%. The plant's relatively small size results in a ranking of 17 out of 32 similar plants in Virginia, and 561 out of 886 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
6 MWh
Latest Month
168 MWh
Annual Generation
0.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1026 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
20 lb/MWh
SO₂
2 lb/MWh
CH₄
0.042 lb/MWh
N₂O
0.008 lb/MWh
Capacity Factor
0.5%
Annual Net Gen
0 GWh
CO₂eq
1030 lb/MWh
Subregion
RFC West
2013
$765/kW
Est. Construction Cost
Total estimated cost: $3.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
Blue Ridge
Pricing Hub
DOMINION HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Orange Street G1Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.