Search plants, projects, owners, and states
1 MW Solar operating in Chisago, MN
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2020
Operating Since
Coordinates
45.4904, -92.8129
County
Chisago, MN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Standard Solar | Standard Solar | — |
| Owner(s) | Standard Solar, US Solar | US Solar; Standard Solar | — |
| Status | Operating | operating | — |
GEM identifies the owner as US Solar; Standard Solar
This entity is not yet in the GEM ownership database — chain unavailable.
The USS Sunrise Solar LLC CSG is a 1 MW solar photovoltaic power plant located in Chisago County, Minnesota. The plant began operating in 2020 and has a single generator. It is owned and operated by Standard Solar. The plant utilizes single-axis tracking to maximize solar energy capture.
The plant's latest annual generation was 1,449 MWh, resulting in a capacity factor of 16.5%. The USS Sunrise Solar LLC CSG operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority. In terms of size, the plant ranks 279th out of 540 power plants in Minnesota, and 6582nd out of 7108 plants nationally. The plant resides within the MRO (Midwest Reliability Organization) NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
17 MWh
Latest Month
1.4K MWh
Annual Generation
16.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →Data from 2021–2024
$29.8/MWh
Energy Value
$2.6/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about USS Sunrise Solar LLC CSGForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo