250.2 MW Wind operating in Hyde, SD
250.2 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2020
Operating Since
Coordinates
44.4440, -99.5602
County
Hyde, SD
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Engie North America | GE Renewable Energy | — |
| Owner(s) | Triple H Wind Project, LLC | ENGIE | — |
| Status | Operating | operating | — |
The Triple H Wind Project is a 250.2 MW wind farm located in Hyde County, South Dakota. The plant began operating in 2020 and is owned and operated by Engie North America, a subsidiary of the French company ENGIE. It is the third-largest wind farm in South Dakota out of 14, and ranks 163rd nationally out of 734 wind facilities. The facility consists of a single generator utilizing onshore wind turbine technology. Key engineering specifications include a 90-meter hub height and a 116-meter rotor diameter. The wind turbines were manufactured by GE Wind, model GE2.72-116.
The Triple H Wind Project operates within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region. In its latest year of operation, the plant generated 1,030,948 MWh of electricity, achieving a capacity factor of 47.0%.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
93.1K MWh
Latest Month
1.0M MWh
Annual Generation
47.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2020
$1,598/kW
Est. Construction Cost
Total estimated cost: $399.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Chapelle Creek Substation · 345 kV
Substation Distance
0 km
Operator
Basin Electric Power Cooperative
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
WAUE.BEPM.TRIPLEHWIND
Pricing Hub
SPPNORTH_HUB
Location Type
Settlement Location
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Triple H Wind ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.