250.2 MW Wind operating in Hyde, SD
250.2 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2020
Operating Since
Coordinates
44.4440, -99.5602
County
Hyde, SD
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Engie North America | GE Renewable Energy | — |
| Owner(s) | Triple H Wind Project, LLC | ENGIE | — |
| Status | Operating | operating | — |
The Triple H Wind Project is a 250.2 MW wind farm located in Hyde County, South Dakota. The plant began operating in 2020 and is owned and operated by Engie North America, a subsidiary of the French company ENGIE. It is the third-largest wind farm in South Dakota out of 14, and ranks 163rd nationally out of 734 wind facilities. The facility consists of a single generator utilizing onshore wind turbine technology. Key engineering specifications include a 90-meter hub height and a 116-meter rotor diameter. The wind turbines were manufactured by GE Wind, model GE2.72-116.
The Triple H Wind Project operates within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region. In its latest year of operation, the plant generated 1,030,948 MWh of electricity, achieving a capacity factor of 47.0%.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
93.1K MWh
Latest Month
1.0M MWh
Annual Generation
47.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2020
$1,598/kW
Est. Construction Cost
Total estimated cost: $399.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Chapelle Creek Substation · 345 kV
Substation Distance
0 km
Operator
Basin Electric Power Cooperative
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
WAUE.BEPM.TRIPLEHWIND
Pricing Hub
SPP North Hub
Location Type
Settlement Location
Node Source
Curated node match
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Triple H Wind ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo