Search plants, projects, owners, and states
300 MW Wind operating in Limestone, TX
300 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2020
Operating Since
Coordinates
31.5499, -96.9041
County
Limestone, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Engie North America | Engie North America | — |
| Owner(s) | Prairie Hill Wind Project, LLC | ENGIE | — |
| Status | Operating | operating | — |
The Prairie Hill Wind Project is a 300 MW wind farm located in Limestone County, Texas. The plant began operating in 2020 and is owned by ENGIE, a French multinational utility, with Engie North America as the listed operator. The facility utilizes a single generator consisting of onshore wind turbines manufactured by Nordex, specifically the AW140/3000 model. These turbines have a hub height of 82 meters and a rotor diameter of 140 meters.
In its most recent year of operation, the Prairie Hill Wind Project generated 77,779 MWh of electricity, resulting in a capacity factor of 3.0%. The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, and the Texas Reliability Entity (TRE) NERC region. Prairie Hill ranks as the 34th largest wind farm in Texas out of 200, and 90th nationally out of 734.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
77.8K MWh
Annual Generation
3.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2020
$1,329/kW
Est. Construction Cost
Total estimated cost: $398.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ERCOT
LMP Node
PHILLWND_ALL
Pricing Hub
HB_NORTH
Alt. Hub / Zone
LZ_NORTH
Location Type
Resource Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-04-19
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.