8.8 MW BESS operating in Buncombe, NC
8.8 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2020
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
35.5398, -82.5160
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Buncombe, NC
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 3.285 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Duke Energy Progress - (NC) | Duke Energy Progress | — |
| Owner(s) | Duke Energy Progress - (NC) | Duke Energy | — |
| Status | Operating | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The Asheville-Rock Hill Battery is an 8.8 MW battery energy storage system (BESS) located in Buncombe County, North Carolina. The plant began operating in 2020 and is owned and operated by Duke Energy Progress - (NC), a subsidiary of Duke Energy. It is currently ranked as the 11th largest of 36 battery storage facilities in North Carolina, and 862nd nationally out of 1205 such facilities.
The facility consists of a single generator utilizing lithium-ion battery (LIB) chemistry. The BESS has a total storage capacity of 8.8 MWh, providing a duration of 1 hour at its full power output. The Asheville-Rock Hill Battery operates within the Duke Energy Progress West balancing authority, in the SERC NERC region. The plant's primary fuel is listed as 'MWH', indicating that it draws power from the grid to charge its batteries.
Grid Region
Southeast
Market
Bilateral Market
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Duke Energy Progress West (CPLW)
Grid Voltage
22.86 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
−19 MWh
Net Charging
-209 MWh
Annual Net Energy
-0.3%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2020
$758/kW
Est. Construction Cost
Total estimated cost: $6.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-05-31
View all 10 articlesWhat is the total generation capacity of Duke Energy's 208 plants, broken down by energy source?
Structured data lookup for Duke Energy with rankings and aggregations.
Westminister NC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
CPG - Duke 6000 Holabird
Data-driven briefing on Duke Energy — fleet, generation, financial, and news signals.
CPG - Duke 5900 Holabird
Data-driven briefing on Duke Energy — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.