13.4 MW Natural Gas operating in Pickens, SC
13.4 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Fired Combustion Turbine
Technology
2019
Operating Since
Coordinates
34.6779, -82.8231
County
Pickens, SC
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Duke Energy Carolinas, LLC | Duke Energy Carolinas | — |
| Owner(s) | Duke Energy Carolinas, LLC | Duke Energy | — |
| Status | Operating | — | — |
The Duke Energy CHP at Clemson University is a natural gas-fired power plant located in Pickens County, South Carolina. The plant has a total capacity of 13.4 MW and began operating in 2019. It consists of a single natural gas-fired combustion turbine generator. Duke Energy Carolinas, LLC operates the facility, which is owned by Duke Energy. The plant is located within the Duke Energy Carolinas balancing authority and the SERC NERC region.
In its most recent year of operation, the plant generated 94,991 MWh of electricity, achieving a capacity factor of 80.1%. The plant has a power purchase agreement (PPA) with a price of $25 per MWh. According to available data, the Duke Energy CHP at Clemson University ranks 16th out of 20 power plants in South Carolina and 1389th out of 1963 plants nationally. Financial data for the plant is available from FERC and FERC EQRs.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Duke Energy Carolinas (DUK)
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
7.4K MWh
Latest Month
95.0K MWh
Annual Generation
80.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1343 lb/MWh
NOx
4 lb/MWh
SO₂
0.037 lb/MWh
CH₄
0.025 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
92.5%
Annual Net Gen
109 GWh
CO₂eq
1344 lb/MWh
Subregion
SERC Virginia/Carolina
Duke Energy Carolinas, LLC · Data from 2019–2025
$25.0/MWh
PPA Price
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-04-09
View all 9 articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.