Search plants, projects, owners, and states
105.5 MW Wind operating in Henry, IL
105.5 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2023
Operating Since
Coordinates
41.2692, -89.9950
County
Henry, IL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Avangrid Power LLC | Avangrid Renewables | — |
| Owner(s) | Avangrid Power LLC | Avangrid | — |
| Status | Operating | operating | — |
Midland Wind is a 105.5 MW wind power plant located in Henry County, Illinois. The plant began operating in 2023 and is owned by Avangrid, with Avangrid Power LLC as the operator. It consists of a single generator utilizing onshore wind turbine technology. The plant uses Vestas V136-3.8 wind turbines, which have a rotor diameter of 136 meters and a hub height of 105 meters.
In its most recent year of operation, Midland Wind generated 346,152 MWh of electricity, achieving a capacity factor of 37.5%. The plant operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region. Midland Wind ranks as the 42nd largest out of 44 wind plants in Illinois, and 662nd nationally out of 734 wind plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
40.5K MWh
Latest Month
346.2K MWh
Annual Generation
37.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,758/kW
Est. Construction Cost
Total estimated cost: $185.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
N ILLINOIS HUB
Node Source
Plant coordinates only
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all articlesNo Ask reports yet for this entity.
Ask about Midland WindForward forecasts, scenario decomposition, and risk-decision tooling for this asset.