4 MW Solar operating in Hampden, MA
4 MW
Nameplate Capacity
2
Generators
units
Solar Photovoltaic
Technology
2020
Operating Since
Coordinates
42.0086, -72.7814
County
Hampden, MA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | LSE Dorado, LLC | LSE Dorado | — |
| Owner(s) | LSE Dorado, LLC | — | — |
| Status | Operating | operating | — |
Goose Pond Solar is a 4 MW solar photovoltaic power plant located in Hampden County, Massachusetts. The plant began operating in 2020 and is owned and operated by LSE Dorado, LLC. It consists of two generators utilizing fixed-tilt solar tracking technology. Goose Pond Solar is connected to the ISO New England Inc. balancing authority within the Northeast Power Coordinating Council (NPCC) NERC region.
In its most recent year of operation, Goose Pond Solar generated 7,015 MWh of electricity, achieving a capacity factor of 20.0%. The plant ranks 74th out of 435 solar facilities in Massachusetts and 3,519th nationally out of 7,108 plants. The primary fuel source for Goose Pond Solar is solar energy.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
23.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
395 MWh
Latest Month
7.0K MWh
Annual Generation
20.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2021–2024
$31.1/MWh
Energy Value
$2.9/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Southwick Substation · 115 kV
Substation Distance
1.41 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.SOUTHWCK23
Pricing Hub
.H.INTERNAL_HUB
Location Type
NETWORK NODE
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.