Search plants, projects, owners, and states
6 MW BESS operating in Anoka, MN
6 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2018
Operating Since
Coordinates
45.3200, -93.4800
County
Anoka, MN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Gopher Energy Storage, LLC | — | — |
| Owner(s) | Gopher Energy Storage, LLC | — | — |
| Status | Operating | — | — |
Anoka BESS is a 6 MW battery energy storage system located in Anoka County, Minnesota. The plant began operating in 2018 and is owned and operated by Gopher Energy Storage, LLC. It is interconnected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority, within the broader MRO NERC region. The facility is ranked as the fourth-largest of six battery storage plants in Minnesota, and 934th nationally out of 1205 such plants.
The Anoka BESS facility consists of a single generator utilizing battery technology. The system has a total storage capacity of 12 MWh, providing a duration of 2 hours at its full 6 MW output. The battery chemistry used is lithium-ion (LIB). The plant's primary fuel is electricity (MWH), reflecting its role in storing and dispatching power rather than generating it directly from a fuel source.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
−55 MWh
Net Charging
-576 MWh
Annual Net Energy
-1.1%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2018
$1,239/kW
Est. Construction Cost
Total estimated cost: $7.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Anoka
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Anoka BESSForward forecasts, scenario decomposition, and risk-decision tooling for this asset.