103.2 MW Wind planned in Chenango, NY
103.2 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
Planned: —
Planned Operation
Coordinates
42.4379, -75.4806
County
Chenango, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | High Bridge Wind, LLC | Northland Power Inc | — |
| Owner(s) | High Bridge Wind, LLC | Northland Power | — |
| Status | Planned | announced | — |
The High Bridge Wind Project is a 103.2 MW wind power plant located in Chenango County, New York. The facility consists of a single generator utilizing onshore wind turbine technology. It is owned by Northland Power, a Canadian company, and operated by High Bridge Wind, LLC. The plant's primary fuel source is wind (WND).
The High Bridge Wind Project operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. It is ranked as the 19th largest wind farm in New York State out of 22, and 677th nationally out of 734.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$2,114/kW
Est. Construction Cost
Total estimated cost: $218.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone E
Node Source
Plant coordinates only
Last updated 2026-03-26