100 MW Solar operating in Greensville, VA
100 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
36.6976, -77.6118
County
Greensville, VA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Dominion Energy Inc. | Dominion Energy | — |
| Owner(s) | Dominion Energy Inc. | Dominion Energy | — |
| Status | Operating | operating | — |
Sadler Solar is a 100 MW solar photovoltaic power plant located in Greensville County, Virginia. The plant began operating in 2021 and is owned and operated by Dominion Energy Inc. It utilizes single-axis tracking technology. The plant is connected to the PJM Interconnection, LLC balancing authority and is within the SERC NERC region.
In its most recent year of operation, Sadler Solar generated 183,888 MWh of electricity, achieving a capacity factor of 21.0%. The plant is ranked 25th out of 25 solar plants in Virginia and 568th out of 639 nationally. Financial data indicates an installed cost of $1249.7 per kW.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
230.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
8.1K MWh
Latest Month
183.9K MWh
Annual Generation
21.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Solar photovoltaic · VIRGINIA ELECTRIC AND POWER COMPANY · Data from 2021–2024
$1,225/kW
Installed Cost
$-32/kW
Annual CapEx
$3.9/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
EMPORIA 13 KV G12
Pricing Hub
DOMINION HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Sadler SolarForward forecasts, scenario decomposition, and risk-decision tooling for this asset.