Search plants, projects, owners, and states
5 MW BESS operating in Suffolk, NY
5 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2018
Operating Since
Coordinates
40.9618, -72.2099
County
Suffolk, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | East Hampton Energy Storage Center, LLC | — | — |
| Owner(s) | East Hampton Energy Storage Center, LLC | — | — |
| Status | Operating | — | — |
The East Hampton Energy Storage Center is a 5 MW battery energy storage system located in Suffolk County, New York. The plant began operating in 2018 and is owned and operated by East Hampton Energy Storage Center, LLC. It is connected to the New York Independent System Operator (NYISO) grid and falls within the Northeast Power Coordinating Council (NPCC) NERC region.
The facility consists of a single generator utilizing battery technology. The battery energy storage system (BESS) has a total storage capacity of 40 MWh, providing a duration of 8 hours. The battery chemistry is lithium-ion (LIB). In terms of size, the East Hampton Energy Storage Center ranks 45th out of 65 power plants in New York and 979th out of 1205 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
−7 MWh
Net Charging
-281 MWh
Annual Net Energy
-0.6%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2018
$1,239/kW
Est. Construction Cost
Total estimated cost: $6.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
EAST_HAMPTON___DIESEL
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone K
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about East Hampton Energy Storage CenterForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demoNew York Independent System Operator (NYIS)
Grid Voltage
13.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP