175.3 MW Wind operating in Cooke, TX
175.3 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2021
Operating Since
Coordinates
33.5491, -97.3296
County
Cooke, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Wildcat Creek Wind Farm LLC | EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship | — |
| Owner(s) | Wildcat Creek Wind Farm LLC | EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship | — |
| Status | Operating | operating | — |
GEM identifies the owner as EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship
This entity is not yet in the GEM ownership database — chain unavailable.
Wildcat Creek Wind Farm LLC is a 175.3 MW wind power plant located in Cooke County, Texas. The facility began operating in 2021 and is owned and operated by Wildcat Creek Wind Farm LLC. It utilizes a single generator consisting of onshore wind turbines. The plant's turbines were manufactured by Siemens Gamesa Renewable Energy, model SG-4.8-145, with a rotor diameter of 145 meters and a hub height of 79.5 meters.
In its most recent year of operation, Wildcat Creek Wind Farm generated 447,073 MWh of electricity, achieving a capacity factor of 29.0%. The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the Texas Reliability Entity (TRE) NERC region. Wildcat Creek Wind Farm is ranked as the 128th largest wind farm in Texas out of 200, and 409th nationally out of 734.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
43.7K MWh
Latest Month
447.1K MWh
Annual Generation
29.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2021
$1,161/kW
Est. Construction Cost
Total estimated cost: $203.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
ERCOT
LMP Node
WILDWIND_ALL
Pricing Hub
HB_NORTH
Alt. Hub / Zone
LZ_NORTH
Location Type
Resource Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Wildcat Creek Wind Farm LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demoElectric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP