Search plants, projects, owners, and states
1 MW BESS operating in Valdez Cordova, AK
Outside CONUS — spatial-market dimensions not provided by this dataset.
1 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2019
Operating Since
Coordinates
60.5405, -145.7408
County
Valdez Cordova, AK
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cordova Electric Coop, Inc | — | — |
| Owner(s) | Cordova Electric Coop, Inc | — | — |
| Status | Operating | — | — |
The Eyak Service Center BESS is a 1 MW battery energy storage system located in Valdez Cordova County, Alaska. The plant began operating in 2019 and is owned and operated by Cordova Electric Coop, Inc. It is the sixth-largest battery storage plant in Alaska, and ranks 1199th nationally.
The plant utilizes lithium-ion batteries (LIB) to provide 0.9 MWh of energy storage, resulting in a storage duration of approximately 0.9 hours. The primary fuel listed for the facility is "MWH", indicating that it draws power from the grid to charge its batteries. The balancing authority for the plant is listed as "No BA".
Generated from EIA, GEM, and public data sources
Grid Region
Non-ISO
Market
—
NERC Region
—
Balancing Authority
No BA
Grid Voltage
13.0 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility
−3 MWh
Net Charging
-40 MWh
Annual Net Energy
-0.5%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2019
$2,973/kW
Est. Construction Cost
Total estimated cost: $3.0M
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Eyak Service Center BESS