70.1 MW Solar operating in Pender, NC
70.1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
34.6782, -77.9829
County
Pender, NC
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cubico USA, LLC | Cypress Creek Renewables | — |
| Owner(s) | Cubico USA, LLC | Cubico USA LLC | — |
| Status | Operating | operating | — |
GEM identifies the owner as Cubico USA LLC
This entity is not yet in the GEM ownership database — chain unavailable.
Crooked Run is a 70.1 MW solar photovoltaic power plant located in Pender County, North Carolina. The plant began operating in 2019 and has one generator. Cubico USA, LLC is the owner and operator. As of the most recent data, Crooked Run ranks 30th out of 770 solar plants in North Carolina and 1004th nationally out of 7108 plants. The solar array uses a fixed tilt tracking system.
The plant's latest annual generation was 137,181 MWh, resulting in a capacity factor of 22.3%. Crooked Run operates within the Duke Energy Progress East balancing authority and the SERC NERC region. Financial data is available for the plant from LBNL, though specific figures are not provided.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Duke Energy Progress East (CPLE)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
8.3K MWh
Latest Month
137.2K MWh
Annual Generation
22.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →Data from 2019–2024
$20.8/MWh
Energy Value
$9.1/MWh
Capacity Value
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.