25 MW BESS operating in Barnstable, MA
25 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2022
Operating Since
Coordinates
42.0603, -70.1942
County
Barnstable, MA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Eversource | — | — |
| Owner(s) | Eversource | — | — |
| Status | Operating | — | — |
The Outer Cape Community Battery is a 25 MW battery energy storage system located in Barnstable County, Massachusetts. The plant began operating in 2022 and is owned and operated by Eversource. It is the largest of 126 power plants in Massachusetts, based on nameplate capacity, and ranks 668th nationally out of 1205 plants. The facility consists of a single generator utilizing batteries as its primary fuel source (MWH).
The battery system has a total storage capacity of 38 MWh, providing a duration of approximately 1.52 hours at its full 25 MW output. The battery chemistry is lithium-ion (LIB). The Outer Cape Community Battery operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
22.8 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Investor-Owned Utility
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
−3 MWh
Net Charging
-60 MWh
Annual Net Energy
-0.0%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2022
$1,205/kW
Est. Construction Cost
Total estimated cost: $30.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Eversource Substation
Substation Distance
< 10 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.H.INTERNAL_HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-05-31
View all 5 articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.