Search plants, projects, owners, and states
664.7 MW Natural Gas operating in Greene, PA
664.7 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Fired Combined Cycle
Technology
2021
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
39.8934, -79.9306
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Greene, PA
Nearby Plants
This route leads to a substation tagged for generation; a connection to the wider grid is still unconfirmed.
1 mapped line section connects the two facilities over 4.350 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Hill Top Energy Center, LLC | — | — |
| Owner(s) | Hill Top Energy Center, LLC | — | — |
| Status | Operating | — | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Hill Top Energy Center, LLC is a 664.7 MW natural gas-fired combined cycle power plant located in Greene County, Pennsylvania. The plant began operating in 2021 and is owned and operated by Hill Top Energy Center, LLC. It consists of a single generator. The plant is connected to the PJM Interconnection, LLC balancing authority and is situated within the RFC NERC region.
In its most recent year of operation, Hill Top Energy Center generated 4,258,836 MWh of electricity, achieving a capacity factor of 73.0%. The plant is ranked as the 21st largest in Pennsylvania out of 35 plants, and nationally it is ranked 348th out of 945 plants. Recent news coverage of the plant has focused primarily on deals (9 articles) with some regulatory news (1 article).
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
500.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
412.0K MWh
Latest Month
4.3M MWh
Annual Generation
73.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
803 lb/MWh
NOx
0.032 lb/MWh
SO₂
0.004 lb/MWh
CH₄
0.015 lb/MWh
N₂O
0.001 lb/MWh
Capacity Factor
67.8%
Annual Net Gen
3946 GWh
CO₂eq
804 lb/MWh
Subregion
RFC West
2021
$920/kW
Est. Construction Cost
Total estimated cost: $611.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Green Energy Resources Substation · 500 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
Greene County CC
Pricing Hub
WESTERN HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.