Search plants, projects, owners, and states
2.8 MW Hydro planned in Estill, KY
2.8 MW
Nameplate Capacity
6
Generators
units
Conventional Hydroelectric
Technology
Planned: —
Planned Operation
Coordinates
37.7840, -84.1033
County
Estill, KY
Nearby Plants
Forward-looking, asset-specific exposure profile combining climate hazards, generation variability, and counterparty risk into a single decision-grade signal.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lock 11 Hydro Partners, LLC | — | — |
| Owner(s) | Lock 11 Hydro Partners, LLC | — | — |
| Status | Planned | — | — |
The KY No. 11 L&D Hydroelectric Project is a 2.8 MW hydroelectric generating facility located in Estill County, Kentucky. The plant utilizes conventional hydroelectric technology and is powered by water (WAT). It consists of 6 generators. The facility is owned and operated by Lock 11 Hydro Partners, LLC.
The plant operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region. It is ranked as the 10th largest hydroelectric plant out of 14 in the state of Kentucky, and 1119th out of 1464 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
No generation data available for this plant.
2023
$1,415/kW
Est. Construction Cost
Total estimated cost: $4.0M
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
AEP-DAYTON HUB
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about KY No. 11 L&D Hydroelectric ProjectPJM Interconnection, LLC (PJM)
Grid Voltage
15.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP