Search plants, projects, owners, and states
99 MW Batteries (50 MW) + Solar Photovoltaic (50 MW) operating in Lowndes, GA
99 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2020
Operating Since
Coordinates
30.9574, -83.2229
County
Lowndes, GA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Georgia Power Co | Georgia Power | — |
| Owner(s) | Georgia Power Co | Southern | — |
| Status | Operating | operating | — |
The Moody Air Force Base Solar plant is a 99 MW hybrid solar and battery energy storage facility located in Lowndes County, Georgia. The plant, which began operating in 2020, is owned by Southern Company and operated by Georgia Power Co. It utilizes solar photovoltaic technology in conjunction with battery storage. The facility consists of two generators and employs a fixed-tilt solar tracking system.
In its most recent year of operation, the plant generated 84,201 MWh of electricity, resulting in a capacity factor of 9.7%. The plant's primary fuel source is listed as "MWH" in the data. According to available financial data sourced from FERC, the installed cost per kW was $1,649.7. Moody Air Force Base Solar ranks as the 6th largest solar facility out of 9 in Georgia, and 519th out of 1205 nationally. The plant operates within the balancing authority of Southern Company Services, Inc. - Trans, and is located in the SERC NERC region.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Southern Company Services, Inc. - Trans (SOCO)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
5.2K MWh
Net Discharge
84.2K MWh
Annual Net Energy
9.7%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Solar photovoltaic · Georgia Power Company · Data from 2020–2024
$1,645/kW
Installed Cost
$-0/kW
Annual CapEx
$9.9/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Moody Air Force Base SolarForward forecasts, scenario decomposition, and risk-decision tooling for this asset.