Search plants, projects, owners, and states
183.8 MW Wind operating in Wilbarger, TX
183.8 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2019
Operating Since
Coordinates
34.0839, -99.2500
County
Wilbarger, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lockett Windfarm, LLC | Ørsted | — |
| Owner(s) | Lockett Windfarm, LLC | Ørsted | — |
| Status | Operating | operating | — |
Lockett Windfarm is a 183.8 MW wind power plant located in Wilbarger County, Texas. The facility began operating in 2019 and is owned by Ørsted, a company based in Denmark; the operator listed with the EIA is Lockett Windfarm, LLC. The plant utilizes a single generator consisting of onshore wind turbines. Specifically, it uses GE2.5-127 wind turbines manufactured by GE Wind, with a rotor diameter of 127 meters and a hub height of 89 meters.
The plant's latest annual generation was 710,238 MWh, achieving a capacity factor of 44.1%. Lockett Windfarm operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority and the TRE NERC region. It is ranked as the 120th largest wind farm in Texas out of 200, and 392nd nationally out of 734. The plant's primary fuel is wind (WND).
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
68.7K MWh
Latest Month
710.2K MWh
Annual Generation
44.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2019
$1,166/kW
Est. Construction Cost
Total estimated cost: $214.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Southwest Vernon Substation · 138 kV
Substation Distance
< 10 km
Operator
AEP Texas
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Lockett WindfarmForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo