Search plants, projects, owners, and states
209.4 MW Wind operating in Zapata, TX
209.4 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2021
Operating Since
Coordinates
27.1161, -99.2900
County
Zapata, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Reloj del Sol Wind Farm LLC | EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship | — |
| Owner(s) | Reloj del Sol Wind Farm LLC | EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship | — |
| Status | Operating | operating | — |
GEM identifies the owner as EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship
This entity is not yet in the GEM ownership database — chain unavailable.
Reloj del Sol Wind Farm is a 209.4 MW wind power plant located in Zapata County, Texas. The facility, owned and operated by Reloj del Sol Wind Farm LLC, commenced operations in 2021. It utilizes a single generator consisting of onshore wind turbines. The plant is interconnected to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority and resides within the TRE NERC region.
The wind farm's turbines have a hub height of 120 meters and a rotor diameter of 132 meters. The turbines were manufactured by Nordex and are model AW132/3465. In its most recent year of operation, Reloj del Sol Wind Farm generated 592,321 MWh of electricity, achieving a capacity factor of 32.3%. The plant ranks as the 79th largest wind farm in Texas out of 200, and 238th nationally out of 734.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
32.9K MWh
Latest Month
592.3K MWh
Annual Generation
32.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2021
$1,161/kW
Est. Construction Cost
Total estimated cost: $243.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
San Ygnacio Substation · 138 kV
Substation Distance
0 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
RELOJ_ALL
Pricing Hub
HB_SOUTH
Alt. Hub / Zone
LZ_SOUTH
Location Type
Resource Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.