Search plants, projects, owners, and states
149.8 MW Batteries (75 MW) + Solar Photovoltaic (75 MW) planned in Barnwell, SC
149.8 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
33.1353, -81.2391
County
Barnwell, SC
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Big Fork Solar | — | — |
| Owner(s) | Big Fork Solar | — | — |
| Status | Planned | pre-construction | — |
Big Fork Solar is a 149.8 MW hybrid power plant located in Barnwell County, South Carolina. The facility, owned and operated by Big Fork Solar, utilizes both solar photovoltaic technology and batteries for energy storage. It consists of two generators and employs a fixed tilt solar tracking system. The plant's primary fuel source is listed as MWH (megawatt hours), indicating the input of solar energy.
Big Fork Solar operates within the Dominion Energy South Carolina balancing authority and the SERC NERC region. It is ranked as the second largest solar facility out of three in South Carolina, and ranks 406th out of 514 nationally. The plant's hybrid nature and significant capacity contribute to the region's renewable energy portfolio.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Dominion Energy South Carolina (SCEG)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $203.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Big Fork SolarForward forecasts, scenario decomposition, and risk-decision tooling for this asset.