Search plants, projects, owners, and states
20 MW BESS operating in Saratoga, NY
20 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2019
Operating Since
Coordinates
42.9626, -73.7464
County
Saratoga, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | KCE NY 1, LLC | — | — |
| Owner(s) | KCE NY 1, LLC | — | — |
| Status | Operating | — | — |
KCE NY 1 is a 20 MW battery energy storage system located in Saratoga County, New York. The plant began operating in 2019 and is owned and operated by KCE NY 1, LLC. It consists of a single generator utilizing batteries as its primary fuel source, with a total battery storage capacity of 8.4 MWh and a duration of 0.42 hours. The battery chemistry is lithium-ion (LIB).
The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. KCE NY 1 is ranked as the 15th largest energy storage plant out of 65 in New York state, and 691st out of 1205 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
−174 MWh
Net Charging
-2.9K MWh
Annual Net Energy
-1.6%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2019
$2,973/kW
Est. Construction Cost
Total estimated cost: $59.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
KCE_NY_1
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
CAPITL
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all 5 articlesNo Ask reports yet for this entity.
Ask about KCE NY 1Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.