3 MW Wind operating in Providence, RI
3 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2019
Operating Since
Coordinates
41.7978, -71.5297
County
Providence, RI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WED Green Hill, LLC | — | — |
| Owner(s) | WED Green Hill, LLC | — | — |
| Status | Operating | — | — |
WED Green Hill, LLC is a 3 MW wind power plant located in Providence County, Rhode Island. The plant began operating in 2019 and is owned and operated by WED Green Hill, LLC. It consists of a single onshore wind turbine generator. The facility utilizes a Vensys120 wind turbine, manufactured by Vensys, with a rotor diameter of 120 meters and a hub height of 98 meters.
The plant's primary fuel source is wind (WND). In its most recent year of operation, WED Green Hill generated 7,004 MWh of electricity, achieving a capacity factor of 26.7%. The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, WED Green Hill ranks as the 8th largest out of 20 power plants in Rhode Island, and 1272nd out of 1424 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
23.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
759 MWh
Latest Month
7.0K MWh
Annual Generation
26.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2019
$1,593/kW
Est. Construction Cost
Total estimated cost: $4.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Ridgewood Substation · 115 kV
Substation Distance
< 10 km
Operator
Rhode Island Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.Z.RHODEISLAND
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about WED Green Hill, LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.