Search plants, projects, owners, and states
5 MW Solar operating in Kittitas, WA
5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
46.9613, -120.4801
County
Kittitas, WA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Altus Power America Management, LLC | Greenbacker Renewable Energy | — |
| Owner(s) | Greenbacker Renewable Energy Corporation | — | — |
| Status | Operating | operating | — |
The Penstemon Solar Project is a 5 MW solar photovoltaic power plant located in Kittitas County, Washington. The plant began operating in 2022 and is owned and operated by Greenbacker Renewable Energy Corporation. It utilizes single-axis tracking technology to maximize solar energy capture. The plant is connected to the grid and falls under the balancing authority of Puget Sound Energy (PSE) within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, the Penstemon Solar Project generated 10,725 MWh of electricity, achieving a capacity factor of 24.4%. While a relatively small facility, it contributes to Washington's renewable energy portfolio. Penstemon Solar Project is ranked as the 10th largest solar plant in Washington state, and 2482nd nationally out of 7108 plants. The plant consists of a single generator using SUN as its primary fuel.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Puget Sound Energy (PSEI)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
154 MWh
Latest Month
10.7K MWh
Annual Generation
24.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2022
$1,549/kW
Est. Construction Cost
Total estimated cost: $7.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Penstemon Solar ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.