Search plants, projects, owners, and states
99.4 MW Wind operating in Wilbarger, TX
99.4 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2019
Operating Since
Coordinates
34.2259, -99.4780
County
Wilbarger, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Blue Summit II Wind, LLC | — | — |
| Owner(s) | Blue Summit II Wind, LLC | — | — |
| Status | Operating | — | — |
Blue Summit II Wind is a 99.4 MW wind power plant located in Wilbarger County, Texas. The facility began operating in 2019 and is owned and operated by Blue Summit II Wind, LLC. The plant consists of a single generator utilizing onshore wind turbine technology. It is interconnected to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority.
The plant's latest annual generation was 346,902 MWh, resulting in a capacity factor of 39.8%. The wind turbines have a hub height of 90 meters and a rotor diameter of 116 meters. The turbines were manufactured by GE Wind, model GE2.5-116. Blue Summit II Wind ranks as the 202nd largest power plant in Texas out of 245, and 738th nationally out of 1424.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
38.5K MWh
Latest Month
346.9K MWh
Annual Generation
39.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2019
$1,166/kW
Est. Construction Cost
Total estimated cost: $115.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Chillicothe Substation · 69 kV
Substation Distance
< 10 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Blue Summit II WindForward forecasts, scenario decomposition, and risk-decision tooling for this asset.