Search plants, projects, owners, and states
20 MW Solar operating in Churchill, NV
20 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
39.5373, -118.5637
County
Churchill, NV
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Ormat Stillwater Solar PV II, LLC | Enel Green Power | — |
| Owner(s) | Enel Green Power NA, Inc. | Enel | — |
| Status | Operating | operating | — |
The Stillwater GeoSolar Hybrid Plant is a combined 61 MW solar energy and geothermal power plant in the U.S. state of Nevada. Located 12 miles (19 km) NE of Fallon, near Stillwater, the site includes a 26MW solar photovoltaic plant and a 2MW solar thermal plant that were added to a 33MW geothermal plant.
Read more on WikipediaStillwater Solar PV II is a 20 MW solar photovoltaic power plant located in Churchill County, Nevada. The plant began operating in 2018 and is owned and operated by Ormat Stillwater Solar PV II, LLC, a subsidiary of the Italian energy company Enel. The facility utilizes fixed-tilt solar tracking technology. It is interconnected to the Nevada Power Company balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, Stillwater Solar PV II generated 24,345 MWh of electricity, achieving a capacity factor of 13.9%. The plant is ranked as the 31st largest solar facility in Nevada out of 52, and 1388th nationally out of 7108. Financial data related to the plant is available from LBNL Solar.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Nevada Power Company (NEVP)
Grid Voltage
60.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
1.4K MWh
Latest Month
24.3K MWh
Annual Generation
13.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →Data from 2018–2024
$19.1/MWh
Energy Value
$8.9/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Stillwater Solar PV IIForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo