1.4 MW Natural Gas operating in Hartford, CT
1.4 MW
Nameplate Capacity
1
Generators
unit
Other Natural Gas
Technology
2018
Operating Since
Coordinates
41.7463, -72.6894
County
Hartford, CT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Onsite Partners, LLC | — | — |
| Owner(s) | AEP Onsite Partners, LLC | — | — |
| Status | Operating | — | — |
The Trinity College Fuel Cell is a 1.4 MW natural gas-fired power plant located in Hartford County, Connecticut. The plant began operating in 2018 and is owned and operated by AEP Onsite Partners, LLC. It consists of a single generator utilizing "Other Natural Gas" technology. The plant is located within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
In its latest year of reported generation, the Trinity College Fuel Cell produced 11,547 MWh of electricity, achieving a capacity factor of 93.9%. The plant is ranked as the 44th largest in Connecticut out of 49 plants, and 1784th nationally out of 1963 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
4.8 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
944 MWh
Latest Month
11.5K MWh
Annual Generation
93.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2018
$837/kW
Est. Construction Cost
Total estimated cost: $1.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Southwest Hartford Substation · 115 kV
Substation Distance
1.944 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.SW_HARTF23
Pricing Hub
.Z.CONNECTICUT
Location Type
NETWORK NODE
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Trinity College Fuel CellForward forecasts, scenario decomposition, and risk-decision tooling for this asset.