20 MW Wind operating in Brule, SD
20 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2018
Operating Since
Coordinates
43.7144, -98.9227
County
Brule, SD
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | RWE Clean Energy | Consolidated Edison | — |
| Owner(s) | Consolidated Edison Development Inc. | Consolidated Edison | — |
| Status | Operating | operating | — |
Brule County Wind is a 20 MW wind power plant located in Brule County, South Dakota. The plant began operating in 2018 and is owned by Consolidated Edison, with Consolidated Edison Development Inc. serving as the operator. The facility consists of a single generator utilizing onshore wind turbine technology. It is interconnected to the Southwest Power Pool (SPP) balancing authority within the Midwest Reliability Organization (MRO) NERC region.
The plant's wind turbines have a hub height of 80 meters and a rotor diameter of 116 meters. The turbines were manufactured by GE Wind, model GE2.3-116. In its most recent year of operation, Brule County Wind generated 72,478 MWh of electricity, achieving a capacity factor of 41.3%. Brule County Wind ranks as the 22nd largest wind farm in South Dakota out of 24, and 1086th nationally out of 1424 wind plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
6.2K MWh
Latest Month
72.5K MWh
Annual Generation
41.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2018
$1,573/kW
Est. Construction Cost
Total estimated cost: $31.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
SPP
LMP Node
WAUE.NWPS.BRUL
Pricing Hub
SPP North Hub
Location Type
Settlement Location
Node Source
Curated node match
Last updated 2026-03-14