Search plants, projects, owners, and states
2 MW Solar operating in Worcester, MA
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2017
Operating Since
Coordinates
42.2431, -71.6724
County
Worcester, MA
Nearby Plants
Forward-looking, asset-specific exposure profile combining climate hazards, generation variability, and counterparty risk into a single decision-grade signal.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | DG Tufts Knoll, LLC | DG Tufts Knoll | — |
| Owner(s) | DG Tufts Knoll, LLC | — | — |
| Status | Operating | operating | — |
DG Tufts Knoll LLC CSG is a 2 MW solar photovoltaic power plant located in Worcester County, Massachusetts. The plant began operating in 2017 and has one generator. It is owned and operated by DG Tufts Knoll, LLC. The plant's primary fuel source is solar (SUN). It ranks 209th in size among power plants in Massachusetts, and 4595th nationally. The plant uses fixed tilt solar tracking technology.
The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In its latest year of reported generation, the plant produced 2,905 MWh of electricity, achieving a capacity factor of 16.6%.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
13.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
113 MWh
Latest Month
2.9K MWh
Annual Generation
16.6%
Capacity Factor
Data from 2018–2024
$31.8/MWh
Energy Value
$3.0/MWh
Capacity Value
Point of Interconnection
Nearest Substation
Centech Substation · 115 kV
Substation Distance
< 10 km
Operator
Shrewsbury Electric Light & Cable Operations
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.H.INTERNAL_HUB
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.