12 MW Wind under construction in Madison, NY
12 MW
Nameplate Capacity
5
Generators
units
Onshore Wind Turbine
Technology
—
Operating Since
Coordinates
42.9671, -75.7559
County
Madison, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Green Power Energy LLC | Copenhagen Infrastructure Partners P/S | — |
| Owner(s) | Green Power Energy LLC | Copenhagen Infrastructure Partners Holding | — |
| Status | Under construction | announced | — |
Cody Road Wind Farm is a 12 MW wind power plant located in Madison County, New York. The facility consists of 5 onshore wind turbines. It is owned by Copenhagen Infrastructure Partners Holding, a company based in Denmark, and operated by Green Power Energy LLC. The plant's primary fuel source is wind (WND).
Cody Road Wind Farm operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, the plant is ranked 41st out of 45 wind farms in New York state, and 1123rd out of 1424 wind farms nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$2,114/kW
Est. Construction Cost
Total estimated cost: $25.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
FENNER___WINDPWR
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone C
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Cody Road Wind Farm