Search plants, projects, owners, and states
3.5 MW Wind operating in Randall, TX
3.5 MW
Nameplate Capacity
2
Generators
units
Onshore Wind Turbine
Technology
2016
Operating Since
Coordinates
34.9686, -101.7899
County
Randall, TX
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | West Texas A&M University | — | — |
| Owner(s) | Rattlesnake Power, LLC, West Texas A&M University | — | — |
| Status | Operating | — | — |
The UL Advanced Wind Turbine Test Facility is a 3.5 MW wind power plant located in Randall County, Texas. The facility, which began operating in 2016, is owned and operated by West Texas A&M University. It consists of two onshore wind turbines. The plant operates within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region.
The facility utilizes Goldwind GW136 wind turbines, featuring a rotor diameter of 136 meters and a hub height of 130 meters. In its most recent year of operation, the plant generated 8,829 MWh of electricity, achieving a capacity factor of 28.8%. The plant ranks 245th out of 245 wind facilities in Texas, and 1251st out of 1424 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
13.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Political Subdivision
Sector
Commercial Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1.3K MWh
Latest Month
8.8K MWh
Annual Generation
28.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2016
$1,611/kW
Est. Construction Cost
Total estimated cost: $5.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
SPP
LMP Node
SPS.WTAMWIND
Pricing Hub
SPPSOUTH_HUB
Location Type
Settlement Location
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about UL Advanced Wind Turbine Test FacilityForward forecasts, scenario decomposition, and risk-decision tooling for this asset.