21.7 MW Batteries (6 MW) + Solar Photovoltaic (16 MW) operating in Frederick, MD
21.7 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2016
Operating Since
Coordinates
39.4400, -77.4500
County
Frederick, MD
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Montevue Lane Solar, LLC | Montevue Lane Solar | — |
| Owner(s) | Montevue Lane Solar, LLC | — | — |
| Status | Operating | operating | — |
Fort Detrick Solar PV is a 21.7 MW hybrid power plant located in Frederick County, Maryland. The facility, which began operating in 2016, is owned and operated by Montevue Lane Solar, LLC. The plant utilizes solar photovoltaic technology and includes a 6 MWh battery energy storage system (BESS) with a one-hour duration. The BESS uses lithium-ion battery chemistry. The solar array employs a fixed-tilt tracking system. Fort Detrick Solar PV is interconnected to the grid within the PJM Interconnection, LLC balancing authority and the RFC NERC region.
The plant's latest annual generation was 20,558 MWh, resulting in a capacity factor of 10.8%. Fort Detrick Solar PV is ranked as the first of three solar plants in Maryland and 680th out of 1205 nationally. Financial data for the plant is available from LBNL Solar.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Commercial
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
740 MWh
Latest Month
20.6K MWh
Annual Generation
10.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2016–2024
$38.6/MWh
Energy Value
$3.1/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
5021574
Pricing Hub
WESTERN HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all 7 articlesNo Ask reports yet for this entity.
Ask about Fort Detrick Solar PVForward forecasts, scenario decomposition, and risk-decision tooling for this asset.