Search plants, projects, owners, and states
1 MW Bio. Gas operating in Kern, CA
1 MW
Nameplate Capacity
1
Generators
unit
Other Waste Biomass
Technology
2018
Operating Since
Coordinates
35.1731, -119.1164
County
Kern, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | ABEC #4 LLC | — | — |
| Owner(s) | ABEC #4 LLC | — | — |
| Status | Operating | — | — |
ABEC #4 dba CE&S Dairy is a 1 MW biomass power plant located in Kern County, California. The plant began operating in 2018 and is owned and operated by ABEC #4 LLC. The primary fuel source is other waste biomass (OBG), and the plant utilizes one generator with "Other Waste Biomass" technology.
The plant operates within the California Independent System Operator (CAISO) balancing authority, which is part of the Western Electricity Coordinating Council (WECC) NERC region. In terms of power output, ABEC #4 dba CE&S Dairy generated 7,872 MWh in the latest annual reporting period, achieving a capacity factor of 89.6%. The plant's generating capacity ranks it as 29th out of 33 biomass plants in California, and 68th out of 74 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
697 MWh
Latest Month
7.9K MWh
Annual Generation
89.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
42 lb/MWh
SO₂
0.073 lb/MWh
CH₄
0.026 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
96.6%
Annual Net Gen
8 GWh
CO₂eq
1 lb/MWh
Subregion
WECC California
2018
$4,116/kW
Est. Construction Cost
Total estimated cost: $4.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
OLDRIVR_6_N007
Pricing Hub
TH_ZP26_GEN-APND
Alt. Hub / Zone
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about ABEC #4 dba CE&S DairyForward forecasts, scenario decomposition, and risk-decision tooling for this asset.