30 MW BESS operating in San Diego, CA
30 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2021
Operating Since
Coordinates
32.8762, -117.1678
County
San Diego, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | San Diego Gas & Electric Co | San Diego Gas & Electric | — |
| Owner(s) | San Diego Gas & Electric Co | Sempra Energy | — |
| Status | Operating | — | — |
Top Gun Energy Storage is a 30 MW battery energy storage system located in San Diego County, California. The plant began operating in 2021 and is owned by Sempra Energy, with San Diego Gas & Electric Co. (SDG&E) as the operator. The facility utilizes batteries as its primary fuel source (MWH) and employs battery energy storage system (BESS) technology. It has a total storage capacity of 120 MWh, providing a duration of 4 hours. The battery chemistry is lithium-ion (LIB).
The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Top Gun Energy Storage is ranked as the 170th largest power plant in California out of 300, and nationally it is ranked 651st out of 1205.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
−514 MWh
Net Charging
-6.0K MWh
Annual Net Energy
-2.3%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2021
$1,796/kW
Est. Construction Cost
Total estimated cost: $53.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Miramar Gt
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_SP15_GEN-APND
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Top Gun Energy StorageForward forecasts, scenario decomposition, and risk-decision tooling for this asset.