3 MW Wind operating in Hancock, OH
3 MW
Nameplate Capacity
2
Generators
units
Onshore Wind Turbine
Technology
2018
Operating Since
Coordinates
41.0836, -83.6443
County
Hancock, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | OEE XXV LLC | — | — |
| Owner(s) | OEE XXV LLC | — | — |
| Status | Operating | — | — |
The Valfilm Wind Project is a 3 MW wind power plant located in Hancock County, Ohio. The plant began operating in 2018 and is owned and operated by OEE XXV LLC. It consists of two onshore wind turbines. The facility ranks 20th out of 24 wind plants in Ohio and 1267th out of 1424 nationally.
The plant utilizes Goldwind GW87 wind turbines, each with a rotor diameter of 87 meters and a hub height of 80 meters. In its most recent year of operation, the Valfilm Wind Project generated 3,572 MWh of electricity, achieving a capacity factor of 13.5%. The plant is located within the PJM Interconnection, LLC balancing authority and the RFC NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
37.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
821 MWh
Latest Month
3.6K MWh
Annual Generation
13.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2018
$1,573/kW
Est. Construction Cost
Total estimated cost: $4.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
North Findlay Substation · 138 kV
Substation Distance
0.538 km
Operator
AEP Ohio
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
NFINDLAY138 KV T1
Pricing Hub
AEP-DAYTON HUB
Location Type
Load Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Valfilm Wind ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.